SCOPE OF WORKS
The Company's duties included:
1. Protection works for a 500 meters long existing breakwater using 5 m3 ACCROPODE and 6.3 m3 ACCROPODE.
2. Quarry rock: 110.000 m3.
The Client of the project was Zea Marina S.A.. Construction works lasted about eighteen (18) months. The project was completed in January 2009.