SCOPE OF WORKS
The Company's duties included:
1. Basin dredging 20000 m3.
2. Caisson quay wall of 200 m length, at 12 m depth.
3. Relieving prism, concrete superstructure, central port sewage and potable water network.
4. Microtunneling for sewage network.
The Client of the project was the Pireaus Port Authority. Construction works lasted about twelve (12) months. The project was completed in October 2011.